With Ken Hazlett stepping into the general contractor position, construction is now continuing. The photo below was taken on November 27th. They are currently framing the basement walls and preparing to pour concrete.
With Ken Hazlett stepping into the general contractor position, construction is now continuing. The photo below was taken on November 27th. They are currently framing the basement walls and preparing to pour concrete.
This entry was posted on Thursday, November 29th, 2007 at 11:15 am and is filed under Construction. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.